[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Sec. 3, item 3 fig. in draft-vassuer-ccamp-inter-area-as
JP, Arthi,
Can you please post a clean figure for this item to the list.
(Sorry, should have attached the fig. I was referring to.)
As it is, the figure is really difficult to understand (or at
least I couldn't follow it all).
Thanks,
-Vishal
****************************************************************************
3) Example of topology for the inter-AS TE case:
We will consider the following general case, built on a superset of the
various scenarios defined in [INTER-AS-TE-REQS]:
<-- AS 1 ---> <------- AS 2 -----><--- AS 3 ---->
<---BGP---> <---BGP-->
CE1---R0---X1-ASBR1-----ASBR4--
-
-
-R3---ASBR7---
-
-
--ASBR9----R6
|\ \ | / | / | / | | |
| \ ASBR2---/ ASBR5 | -- | | |
| \ | | |/ | | |
R1-R2--
-
-
--ASBR3--
-
-
----ASBR6--
-
-
-R4---ASBR8--
-
-
---ASBR10--
-
-
--R7---CE2
<======= Inter-AS TE LSP(LSR to LSR)===========>
or
<======== Inter-AS TE LSP (CE to ASBR =>
or
<================= Inter-AS TE LSP (CE to CE)===============>
The diagram above covers all the inter-AS TE deployment cases described
in [INTER-AS-TE-REQS].
Vasseur and Ayyangar 8
****************************************************************
Vishal Sharma, Ph.D.
Metanoia, Inc. (Critical Systems Thinking)
888 Villa Street, Suite 200B
Mountain View, CA 94041-1261
Phone: +1 408-530-8313. Voice: +1 408-394-6321
Email: v.sharma@ieee.org. http://www.metanoia-inc.com
****************************************************************