[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Two Drafts for Resilience of Control Plane



Dear all,
 
I posted two drafts for the resilience of control plane.
One is for requirements of the resilience of control plane, the other is for a protocol specification as a solution of that .
These are now available at:
http://www.ietf.org/internet-drafts/draft-kim-ccamp-cpr-reqts-01.txt
http://www.ietf.org/internet-drafts/draft-kim-ccamp-accp-protocol-00.txt
 
I want your comments.
 
Regards
 
Young.
 
====================================
Young-Hwa Kim
Principal Member / Ph.D
BcN Research Division, ETRI
Tel:     +82-42-860-5819
Fax:    +82-42-860-5440
e-mail: yhwkim@etri.re.kr
====================================