so although it is good to see such a variety of preliminary
solution drafts, our main job now is not to design a specific solution, but to conduct the architectural analysis that
will lead to a choice of approach. That's why these two agenda
items are very important:
4. draft-lear-multi6-things-to-think-about-00.txt, 30 mins, Eliot Lear 5. Architectural analysis, Geoff Huston, 20 mins.
so although it is good to see such a variety of preliminary
solution drafts, our main job now is not to design a specific solution, but to conduct the requirement analysis that
will lead to a choice of approach. That's why these two agenda
items are very important:
4. draft-lear-multi6-things-to-think-about-00.txt, 30 mins, Eliot Lear 5. requirement analysis, Geoff Huston, 20 mins.